Finished latrine behind casa #3
Viewed: 152 times.
|
OSHA approved scaffolding.
Viewed: 153 times.
|
Chipping the surface
Viewed: 142 times.
|
Pastor and Dora mixing cement
Viewed: 143 times.
|
Methodist group at casa #3
Viewed: 136 times.
|
Making the hole for the circuit breaker box.
Viewed: 142 times.
|
Leveling the dirt to pour the concrete floor.
Viewed: 143 times.
|
Carol Palmer in casa #3
Viewed: 134 times.
|
Roger, Carol, and mason in casa #3
Viewed: 145 times.
|
Methodist group in front of casa #3
Viewed: 139 times.
|
Cutting glass in casa #3
Viewed: 131 times.
|
Stream behind casa #3
Viewed: 141 times.
|
Dying the floor at casa #3
Viewed: 148 times.
|
Casa #2
Viewed: 151 times.
|
Working on casa #2
Viewed: 135 times.
|
Maria and grandmother at casa #2
Viewed: 127 times.
|
Maria and her mother
Viewed: 140 times.
|
Nelsonito, Alvin, Tana
Viewed: 131 times.
|